Our Portfolio

Recent Work

A selection of our recent projects — from boiler installations and bathroom fit-outs to renewable heating systems and oil tank replacements. Quality workmanship in every job.

Featured Projects

Browse All Photos

Great Missenden Church project by Curtis and Carder
View Project
Project
8 Photos

Great Missenden Church

A full project gallery with 8 photos — click to explore.

Naunton project by Curtis and Carder
View Project
Project
7 Photos

Naunton

A full project gallery with 7 photos — click to explore.

Bunded Oil Tank Installation project by Curtis and Carder
View Project
Project
5 Photos

Bunded Oil Tank Installation

A full project gallery with 5 photos — click to explore.

Manor House Heating & Plumbing Installation project by Curtis and Carder
View Project
Project
5 Photos

Manor House Heating & Plumbing Installation

A full project gallery with 5 photos — click to explore.

Vale House Plant Room Installation project by Curtis and Carder
View Project
Project
2 Photos

Vale House Plant Room Installation

A full project gallery with 2 photos — click to explore.

Commercial Hot Water System Installation project by Curtis and Carder
View Project
Project
9 Photos

Commercial Hot Water System Installation

A full project gallery with 9 photos — click to explore.

Oxfordshire Manor House project by Curtis and Carder
View Project
Project
3 Photos

Oxfordshire Manor House

A full project gallery with 3 photos — click to explore.

Tusmore Close House project by Curtis and Carder
View Project
Project
3 Photos

Tusmore Close House

A full project gallery with 3 photos — click to explore.

Vale House Replacement Hot Water Cylinder project by Curtis and Carder
View Project
Project
6 Photos

Vale House Replacement Hot Water Cylinder

A full project gallery with 6 photos — click to explore.

Vale House Emergency Hot Water project by Curtis and Carder
View Project
Project
2 Photos

Vale House Emergency Hot Water

A full project gallery with 2 photos — click to explore.

Bathroom project by Curtis and Carder
View Project
Project
4 Photos

Bathroom

A full project gallery with 4 photos — click to explore.

Buckingham Bathroom project by Curtis and Carder
View Project
Project
8 Photos

Buckingham Bathroom

A full project gallery with 8 photos — click to explore.

Buckingham Air Source Heatpump project by Curtis and Carder
View Project
Project
7 Photos

Buckingham Air Source Heatpump

A full project gallery with 7 photos — click to explore.

No hot water on a combi project by Curtis and Carder
View Project
Project
4 Photos

No hot water on a combi

A full project gallery with 4 photos — click to explore.

Oil Boiler Breakdown project by Curtis and Carder
View Project
Project
4 Photos

Oil Boiler Breakdown

A full project gallery with 4 photos — click to explore.

Oil Boiler Service project by Curtis and Carder
View Project
Project
8 Photos

Oil Boiler Service

A full project gallery with 8 photos — click to explore.

Modern Bathroom Installation — Bathrooms project by Curtis and Carder
Bathrooms

Modern Bathroom Installation

Complete bathroom fit-out with contemporary fixtures and premium tiling.

Air Source Heat Pump — Renewables project by Curtis and Carder
Renewables

Air Source Heat Pump

MCS accredited renewable heating system designed to reduce energy bills.

Oil Tank Installation — Oil Tanks project by Curtis and Carder
Oil Tanks

Oil Tank Installation

OFTEC registered installation of a compliant, safe oil storage tank.

Boiler Servicing — Servicing project by Curtis and Carder
Servicing

Boiler Servicing

Annual service ensuring safe and efficient boiler operation.

Heating System Installation — Heating project by Curtis and Carder
Heating

Heating System Installation

Full central heating system installation by Gas Safe registered engineers.

Plumbing Installation — Plumbing project by Curtis and Carder
Plumbing

Plumbing Installation

Quality plumbing solutions delivered with decades of experience.

Unvented Hot Water Cylinder — Heating project by Curtis and Carder
Heating

Unvented Hot Water Cylinder

Megaflow-style unvented cylinder installed in an airing cupboard with expansion vessel, pressure relief valve, and tundish — all to G3 building regulations.

Twin Boiler Plant Room — Wide View — Heating project by Curtis and Carder
Heating

Twin Boiler Plant Room — Wide View

A wide view into the plant room during fit-out — twin wall-mounted Worcester Bosch boilers on the plywood-lined back wall, with a black heat exchanger, copper pipe runs and a circulation pump, ahead of final connections.

Worcester Bosch Boiler Installation — Kitchen Utility — Heating project by Curtis and Carder
Heating

Worcester Bosch Boiler Installation — Kitchen Utility

A white wall-mounted Worcester Bosch boiler installed in a kitchen utility area, with copper pipework, a black magnetic filter, and a wireless control unit mounted alongside.

Twin Boiler Plant Room — Manifold & Zone Controls — Heating project by Curtis and Carder
Heating

Twin Boiler Plant Room — Manifold & Zone Controls

The finished plant room — twin Worcester Bosch boilers with a five-zone copper manifold, red isolation valves, black circulation pumps, and integrated electrical controls against the brick wall.

Boiler Repair — Before — Heating project by Curtis and Carder
Heating

Boiler Repair — Before

The existing Worcester Bosch boiler housed in a kitchen cabinet before servicing, with its digital controller, adjacent pipework and tiled surround.

Boiler Repair — After — Heating project by Curtis and Carder
Heating

Boiler Repair — After

The Worcester Bosch boiler after servicing, with a black magnetic filter fitted, copper pipework tidied, and a digital programmer showing the operating temperature on the tiled wall.

Heating Fault — Drayton Zone Valve (Before) — Heating project by Curtis and Carder
Heating

Heating Fault — Drayton Zone Valve (Before)

A Drayton zone valve actuator marked 'RAD' with the associated brass valve body and copper pipework, investigated during a heating fault call-out.

Heating Fault — Zone Valve Replaced (After) — Heating project by Curtis and Carder
Heating

Heating Fault — Zone Valve Replaced (After)

The repaired heating circuit — a new Drayton zone valve actuator fitted, with insulated pipework and a labelled junction box, restoring normal radiator operation.

No Hot Water Fault — Pipework & Control Box — Heating project by Curtis and Carder
Heating

No Hot Water Fault — Pipework & Control Box

Close-up of the copper pipework and Honeywell junction box inspected during a 'no hot water' fault, with a red pump unit visible to the right.

No Hot Water Fault — Pump Repaired — Heating project by Curtis and Carder
Heating

No Hot Water Fault — Pump Repaired

The repaired circuit — a red Grundfos circulation pump reconnected with copper pipework and a high-voltage electrical junction box, restoring hot water to the property.

Bunded Oil Tank Installed on Concrete Base — Oil Tanks project by Curtis and Carder
Oil Tanks

Bunded Oil Tank Installed on Concrete Base

A green bunded plastic oil storage tank installed on a weathered concrete slab, with the copper oil feed line and filter valve assembly connected and routed along the base.

Toilet Leak — Before — Plumbing project by Curtis and Carder
Plumbing

Toilet Leak — Before

The original white PVC waste pipe assembly at the toilet pan outlet, showing the angled elbow and flanged connection into the wall before the leak was repaired.

Toilet Leak — After — Plumbing project by Curtis and Carder
Plumbing

Toilet Leak — After

The repaired toilet waste connection — a new white plastic pipe and flexible coupling secured to the toilet base, with the leak resolved and the area tidied.

Under-Sink Water Leak — Before — Plumbing project by Curtis and Carder
Plumbing

Under-Sink Water Leak — Before

The original leaking white plastic P-trap assembly removed from beneath the sink, showing stained threads and the worn trap that was causing the leak.

Under-Sink Water Leak — After — Plumbing project by Curtis and Carder
Plumbing

Under-Sink Water Leak — After

The repaired under-sink waste — a new white plastic P-trap with threaded collars and braided flexible supply hoses, all connected and leak-free within the cabinet.

Water Leak — Before — Plumbing project by Curtis and Carder
Plumbing

Water Leak — Before

Copper pipework with a stopcock and earth bonding wire against a wall with peeling paint, inspected to locate the source of the water leak.

Water Leak — After — Plumbing project by Curtis and Carder
Plumbing

Water Leak — After

The repaired pipework — copper runs with compression fittings and a stopcock, the earth bonding reconnected, and the leak resolved.

Heating Leak — Auto Air Vent Corrosion — Plumbing project by Curtis and Carder
Plumbing

Heating Leak — Auto Air Vent Corrosion

A brass automatic air vent on a vertical copper pipe showing verdigris corrosion, with red-handled isolation valves on the insulated flow and return pipework behind.

Heating Leak — Repaired Auto Air Vent — Plumbing project by Curtis and Carder
Plumbing

Heating Leak — Repaired Auto Air Vent

The repaired auto air vent with a new black cap, fitted to the copper T-junction feeding the insulated pipe run, with the leak resolved and the circuit reinstated.

Kitchen Tap — Problem Diagnosis — Plumbing project by Curtis and Carder
Plumbing

Kitchen Tap — Problem Diagnosis

A chrome pull-down kitchen tap on a granite worktop inspected to diagnose a fault, with the sink strainer and surrounding fixtures visible.

Kitchen Tap — Faulty Unit — Plumbing project by Curtis and Carder
Plumbing

Kitchen Tap — Faulty Unit

The faulty chrome kitchen tap with pull-out spray head, showing the detached sprayer section before the internal cartridge was replaced.

Kitchen Tap — New Internal Cartridge — Plumbing project by Curtis and Carder
Plumbing

Kitchen Tap — New Internal Cartridge

The kitchen tap fitted with a new internal cartridge and brass quick-connect fitting on the pull-down hose, restoring normal operation.

Taps Not Turning Off — Faulty Cold Tap — Plumbing project by Curtis and Carder
Plumbing

Taps Not Turning Off — Faulty Cold Tap

An Attersall Corona cold tap that would not turn off, photographed on the basin before the repair was carried out.

Taps Not Turning Off — Handles Removed — Plumbing project by Curtis and Carder
Plumbing

Taps Not Turning Off — Handles Removed

The tap handles removed to expose the valve stems, with an adjustable wrench on the basin deck during the repair.

Taps Not Turning Off — Valve Stem Exposed — Plumbing project by Curtis and Carder
Plumbing

Taps Not Turning Off — Valve Stem Exposed

Close-up of the chrome tap with the headgear removed, exposing the brass threaded valve stem and rubber washer ready for replacement.

Taps Not Turning Off — Repair Completed — Plumbing project by Curtis and Carder
Plumbing

Taps Not Turning Off — Repair Completed

The completed repair — new Attersall Coronation 1902 taps with white porcelain 'HOT' and 'COLD' handles fitted and working correctly on the basin.

Basin Taps — Customer Could Not Turn Off — Plumbing project by Curtis and Carder
Plumbing

Basin Taps — Customer Could Not Turn Off

A white porcelain basin with two chrome pillar taps the customer was unable to turn off, photographed on site before the repair.

Basin Taps — Before — Plumbing project by Curtis and Carder
Plumbing

Basin Taps — Before

A mint-green Twyfords pedestal basin with the original chrome taps running, photographed before the taps were reconditioned.

Basin Taps — After — Plumbing project by Curtis and Carder
Plumbing

Basin Taps — After

The same mint-green Twyfords pedestal basin after the tap repair — the chrome taps rebuilt and running cleanly into the basin.

New Bathroom Installation — Plumbing project by Curtis and Carder
Plumbing

New Bathroom Installation

A newly fitted bathroom with a white vanity unit and basin, a shower cubicle with glass enclosure, and white wall tiling — completed as part of a plumbing and bathroom installation.

Mitsubishi Electric ZUBADAN Heat Pump Installed — Renewables project by Curtis and Carder
Renewables

Mitsubishi Electric ZUBADAN Heat Pump Installed

A Mitsubishi Electric ZUBADAN R32 air source heat pump installed outdoors on a concrete slab with anti-vibration feet, against a stone and brick wall.

Twin Mitsubishi ZUBADAN Heat Pumps — Patio Installation — Renewables project by Curtis and Carder
Renewables

Twin Mitsubishi ZUBADAN Heat Pumps — Patio Installation

Two Mitsubishi Electric ZUBADAN air source heat pumps installed side-by-side on concrete pavers, set against a timber-clad and brick building on a stone patio.

Grant Aerona³ Heat Pump — Up and Running — Renewables project by Curtis and Carder
Renewables

Grant Aerona³ Heat Pump — Up and Running

A Grant Aerona³ air source heat pump installed on a concrete slab against a red brick wall, commissioned and running.

Grant Aerona³ Heat Pump with Pipe Housing — Renewables project by Curtis and Carder
Renewables

Grant Aerona³ Heat Pump with Pipe Housing

A Grant Aerona³ air source heat pump installed on a raised concrete pad against a red brick wall, with black pipework routed from a timber slatted housing and a stone-flagged patio in the foreground.

Like What You See?

Get in touch today to discuss your project — whether it's a boiler service, a new bathroom, or a full heating system installation.

Start Your Project
Curtis and Carder Services Ltd
Curtis and CarderServices Ltd

Family run heating and plumbing company serving Bicester and beyond for over 40 years.

"Not just a business, it's a family trade."

Services

  • Boiler Servicing
  • Heating Systems
  • Plumbing
  • Renewables
  • Oil Tanks
  • Bathrooms
  • Underfloor Heating

Contact

  • Unit 1, Church Lane, Hardwick, Bicester, OX27 8SS
  • 01869 277547
  • Mon–Fri: 8:00–17:00

    Emergency: Mon–Fri 17:00–21:00

    Sat–Sun: 09:00–20:00

© 2026 Curtis and Carder Services Ltd. All rights reserved.

Gas Safe: 8201OFTEC: C442MCS AccreditedNAPIT: NAP28773/256

Cookie Notice

We use cookies to improve your experience, analyse website traffic and support our marketing efforts. Essential cookies are required for the site to function. You can choose to accept all cookies or reject non-essential cookies. See our privacy information for more details.